Tag Archives: e street construction san bernardino

sbX Construction Update for August 20th-24th

The sbX weekly construction update lists the places, dates, times and details of construction activity currently taking place in San Bernardino in preparation for the sbX bus rapid transit project.

Kendall Drive and Palm Avenue Park-and-Ride-Facility

  • Parameters: South of Kendall Drive and Palm Avenue intersection
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Work on park-and-ride restroom continues.
  • LANE CLOSURE: NA

CSUSB

  • Parameters: New bus station location on campus
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Prep for roadway work of August 27th.
  • LANE CLOSURE: Traffic control in effect.

Marshall Blvd. Park-and-Ride Facility

  • Parameters: Northeast & northwest corners of E Street and Marshall Blvd.
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: work on bus passenger platform continues
  • LANE CLOSURE: Traffic control in effect

E Street

  • Parameters: Select locations between 10th Street and Hospitality Lane
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Driveway, curb and gutter work continues, electrical activities, street light activities
  • LANE CLOSURE: Parking and lane nearest the curb along the east side of E Street between 10th Street and 6th Street has been eliminated. Traffic control in effect on east and west side of E Street throughout the corridor.

 Hospitality Lane

  • Parameters: Select locations between E Street and Tippecanoe Avenue
  • Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
  • Intermittent Day Work
  • Specifics: Driveway, curb and gutter work continues including sidewalk removals, storm drain activities,water meter relocation activities. (Please note that businesses affected by water meter relocation  activities will be contacted after at least 24 hours in advance.) Electrical activities, street light activities
  • LANE CLOSURE: North side of Hospitality Lane nearest the curb is closed.

 Various Bus Station Locations

  • Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Platform structure activities such as rebar placement and concrete slab curing; storm drain activities.
  • LANE CLOSURE: Traffic control in effect at some locations.
To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.


About sbX

The sbX BRT Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Visit the Omnitrans sbX Facebook page!
http://facebook.com/omnitrans.sbx

sbX Construction Update for August 13th-17th

The sbX weekly construction update lists the places, dates, times and details of construction activity currently taking place in San Bernardino in preparation for the sbX bus rapid transit project.

Kendall Drive and Palm Avenue Park-and-Ride-Facility

  • Parameters: South of Kendall Drive and Palm Avenue intersection
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Work on park-and-ride restroom continues, Work on sidewalk ramps
  • LANE CLOSURE: NA

CSUSB

  • Parameters: New bus station location on campus
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Roadway work continues, work on bus passenger platform continues
  • LANE CLOSURE: Traffic control in effect.

E Street

  • Parameters: Select locations between 10th Street and Hospitality Lane
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Driveway, curb and gutter work continues including sidewalk removals, landscaping activities (includes work in center median), electrical activities, street light activities
  • LANE CLOSURE: Parking and lane nearest the curb along the east side of E Street between 10th Street and 6th Street has been eliminated. Traffic control in effect on east and west side of E Street throughout the corridor.

 Hospitality Lane

  • Parameters: Select locations between E Street and Tippecanoe Avenue
  • Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
  • Intermittent Day Work
  • Specifics: Driveway, curb and gutter work continues including sidewalk removals, landscaping activities (includes tree removal and clearing work in center median between Tippecanoe Avenue and Carnegie Drive West), irrigation activities, electrical activities, street light activities
  • LANE CLOSURE: North side of Hospitality Lane nearest the curb is closed.

 Various Bus Station Locations

  • Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Platform structure activities such as slab work, forming walls and erecting structure steel continues
  • LANE CLOSURE: Traffic control in effect at some locations.
To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.


About sbX

The sbX BRT Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Visit the Omnitrans sbX Facebook page!
http://facebook.com/omnitrans.sbx

sbX Construction Update for June 30 – August 3

To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.

Kendall Drive and Palm Avenue Park-and-Ride-Facility

  • Parameters: South of Kendall Drive and Palm Avenue intersection
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Work on park-and-ride restroom continues, Sidewalk grading
  • LANE CLOSURE: NA


CSUSB

  • Parameters: New bus station location on campus
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Roadway work such as paving, pouring and concrete curing activities continue, work on bus passenger platform continues
  • LANE CLOSURE: Traffic control in effect.


E Street

  • Parameters: Select locations between 10th Street and Hospitality Lane
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Driveway, curb and gutter work continues, tree relocation, storm drain activities, electrical activities, street light activities, fire hydrant relocation activities, water meter relocation activities
  • LANE CLOSURE: Parking and lane nearest the curb along the east side of E Street between 10th Street and 6th Street has been eliminated. Traffic control in effect on east and west side of E Street throughout the corridor.
  • Please note: Properties impacted by water meter relocation activities will receive notification prior to service. 


Hospitality Lane

  • Parameters: Select locations between E Street and Tippecanoe Avenue
  • Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
  • Intermittent Day Work
  • Specifics: Driveway, curb and gutter work continues, landscaping activities, irrigation activities, electrical activities, street light activities
  • LANE CLOSURE: North side of Hospitality Lane nearest the curb is closed.
 

Various Bus Station Locations

  • Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Storm drain activities, and platform structure activities such as pouring slab, forming walls and erecting structure steel, irrigation activities
  • LANE CLOSURE: Traffic control in effect at some locations. 


About sbX

The sbX BRT Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Visit the Omnitrans sbX Facebook page!
http://facebook.com/omnitrans.sbx

Alternate bus stops planned due to construction

Several new areas of the SbX corridor will be starting construction on Monday, June 18th.

Alternate stops planned for Cal State San Bernardino
Construction will be starting at Cal State San Bernardino which will cause the temporary closure of our bus stop. On Monday, we will adjust our stop to an area in front of the Coyote Book Store.  The stop will only be at this location for one week, and we will relocate to an area on Coyote Way near the Student Fitness Center and Jack Brown Building.  We will be at this location until the end of September or sooner if access is permitted back at the original stop area.

Alternate stops planned along E Street
Construction activities will also be starting on E Street between Orange Show Road and Hospitality Lane.  Bus stops in both directions at E Street & Orange Show Road and E Street & Century will be out of service.  We will have stops in both directions at E Street & Chandler.  Our bus stops further south at E Street & McKay will remain in service.

We will also provide an adjusted stop at E Street & Orange Show Road to serve the northbound E Street & Orange Show Road closed stop.  E Street & Orange Show Road, southbound, will need to use either the preceding stop at E Street & South Mall or our temporary stop at E Street & Chandler.

For Omnitrans bus information call toll-free 800-966-6428.

For the sbX Project Helpline call toll-free 855-729-6397