sbX Construction Update for Oct. 29- Nov. 2

The sbX weekly construction update lists the places, dates, times and details of construction activity currently taking place in San Bernardino in preparation for the sbX bus rapid transit project.

Kendall Drive and Palm Avenue Park-and-Ride-Facility

  • Parameters: South of Kendall Drive and Palm Avenue intersection
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Grading Activities, landscaping activities, electrical activities
  • LANE CLOSURE: No traffic control in effect

CSUSB

  • Parameters: New bus station location on campus
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: NA
  • LANE CLOSURE: No traffic control in effect.

Marshall Blvd. Park-and-Ride Facility

  • Parameters: Northeast & northwest corners of E Street and Marshall Blvd.
  • Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
  • Specifics: Work on bus pads continues, parking lot construction, electrical activities, lighting activities
  • LANE CLOSURE: Traffic control in effect

E Street

  • Parameters: Select locations between 10th Street and Hospitality Lane
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Utility relocations, driveway, sidewalk, curb and gutter work, domestic water work, storm drain activities, traffic signal activities, electrical activities
  • LANE CLOSURE: Traffic control in effect in some areas along E Street between 10th Street and Hospitality Lane.

 Hospitality Lane

  • Parameters: Select locations between E Street and Tippecanoe Avenue
  • Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
  • Intermittent Day Work
  • Specifics: Electrical activities, traffic signal activities, landscaping removal activities, irrigation activities
  • LANE CLOSURE: Traffic control in effect along Hospitality Lane between E Street and Tippecanoe Avenue.

 Various Bus Station Locations

  • Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
  • Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
  • Night Work: Mon. – Fri. from 9 p.m. to 7 a.m. nightly
  • Specifics: Platform structure activities, curb and gutter work, storm drain construction, bus pad construction, utility activities
  • LANE CLOSURE: Traffic control in effect at some locations.
To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.


About sbX

The sbX Bus Rapid Transit (BRT) Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Visit the Omnitrans sbX Facebook page!
http://facebook.com/omnitrans.sbx

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s