sbX Construction Update for June 18-22

To establish a safe work environment for crews and the public, the construction crew has implemented traffic control measures that allow for at least one lane in each direction to be open during construction. Maintaining access to businesses is a high priority as part of this project. As such, signage is placed throughout the corridor to inform the public that they are open for business.

Kendall Drive and Palm Avenue Park-and-Ride-Facility
Parameters: South of Kendall Drive and Palm Avenue intersection
Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
Specifics: Concrete paving, asphalt paving
LANE CLOSURE: NA

CSUSB
Parameters: New bus station location on campus
Day Work: Mon. – Fri. from 7 a.m. to 4 p.m. daily
Specifics: Cut and cap irrigation activities, tree and landscape removal, traffic control implementation, potholing, roadway concrete cutting, roadway leveling
LANE CLOSURE: Traffic control to be placed Monday, June 18

E Street
Parameters: Select locations between 10th Street and Hospitality Lane
Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
Night Work: Sun. – Fri. from 9 p.m. to 7 a.m. nightly
Specifics: Driveway, curb and gutter work continues, roadway concrete cutting, storm drain activities, electrical activities, traffic control implementation
LANE CLOSURE: Parking and lane nearest the curb along the east side of E Street between 10th Street and 6th Street has been eliminated.

Hospitality Lane
Parameters: Select locations between Diners Court and Tippecanoe Avenue
Night Work: Mon. – Fri. from 10 p.m. to 7 a.m.
Intermittent Day Work: Sat. June 16 and Mon. June 18 near the intersection of Hospitality Lane and Waterman Avenue
Specifics: Driveway, curb and gutter work continues, continue work on bus pads, electrical activities, paving and asphalt work
LANE CLOSURE: North side of Hospitality Lane nearest the curb is closed.

Various Bus Station Locations
Parameters: Little Mountain Drive, Shandin Hills Drive, Marshall Boulevard, Highland Avenue, Baseline Street
Day Work: Mon. – Fri. 7 a.m. to 4 p.m. daily
Night Work: Sun. – Fri. from 9 p.m. to 7 a.m. nightly
Specifics: Irrigation activities, electrical activities, foundation activities, underground utility work
LANE CLOSURE: North side of Hospitality Lane nearest the curb is closed.

 

About sbX

The sbX BRT Project is the first-of-its kind express service to be constructed in the Inland Empire. It is the beginning of an intermodal public transit system in the San Bernardino Valley that will help reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient.

The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s