sbX Construction And Bus Stop Closures

sbX Rapid TransitWork on Phase 1 for the SbX service begins on Monday, February 6. This work is expected to last 4 months and will affect several bus stops. As always, buses will stop where safe.


Route 7:

All bus stops will be open.  Construction may cause traffic to narrow to one lane on E Street, but all stops will be open.

Route 2:
Bus Stops #5479 and #5480,  located on the west side of E Street, below Baseline to Sixth Street, will be closed.

Bus Stop #5487, located on the west side of E Street and North Mall, will be open, but the shelter will not be accessible.

Bus Stop #5488, located on the west side of E Street and South Mall, will be open, but buses may park south of the shelter to pick up and drop off.

Routes 2 and 215:
Bus Stop #5483, located on the west side of E Street, at the intersection of Rialto Ave., will be closed.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s